KMWE’s annual figures

This week, the 20th CNC-machine was installed at our new factory at Brainport Industries Campus. As many as twelve trucks were needed for the relocation of our largest CNC-machine which requires a lot of organization. Needless to say that these are hectic times, but our growth forecast remains strong for the upcoming year.

Read the entire article in Dutch:
Eindhovens Dagblad by Harrie Verrijt | 27-03-2019